Home  >  Timers

Timing Tools - TOP-255

1.Professional staff, 2.Especially for western Europe., 3.Customized designs are accepted., 4.OEM orders are welcomed. - more info check here: http://www.buymeasuringtools.com/Timing-Tools-10060247/

Quick Brief

Place of Origin: Guangdong China (Mainland) Brand Name: TOPWELL Mould Model Number: TOP-255 Theory: Electronic Usage: kitchen,industrial,multifunctional,Timer... Type: Mini Mould technology experience:: 16years Mould base:: LKM, HASCO,DME ect Design software:: UG, PROE, CAD ect. Mould life:: 100,000-300,000 shots Delivery time:: 15-60days Quality:: ISO9001-2000/ISO14001:2004 certificat...

Product Features:

1.Professional staff

2.Especially for western Europe.

3.Customized designs are accepted.

4.OEM orders are welcomed.

Business Terms:

Port: Shenzhen/HK

Minimum Order Quantity: 1 Set/Sets More Cheaper

Supply Ability: 50 Set/Sets per Month others

Payment Terms: T/T,Western Union

Contact Supplier
Timing Tools
Share to: Facebook Twitter LinkedIn Google+

Product Packagings & Delivery Terms:

Packaging Detail: For mold: After assemble and clear mold, we paint anti-rust fog or grease on mold, then cover it with thin film and place it into a stable wooden box. For plastic product: the first thing is to wrap each part up with semi-transparent thin foam and put it into plastic bag, the second step is place them into cartons with thin sponge plates to prevent scratches.

Delivery Detail: mould: 30-40 days, products: 3-? Days

Specifications and Product Details:

plastic injection mould

Nameplastic injection mould
mould material45#,P20,H13,718,2738,NAK80,S136etc.
mould baseLKM,HASCOect.
CavitySingle/multi
RunnerHot/cold

Mould life

45# :300,000-500,000shots
P20: 500,000shots
718: 700,000shots
Design softwareUG,PROE,CADetc.
Plastic materialPP,PE,ABS,PCetc.
Delivery time15-60days
SpecificationAccording to client’s requirements

plastic injection mould

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Timing Tools suppliers    Timing Tools manufacturers