The Chinese first-class testing machine manufacturers, can through the third party inspection
Port: ShenZhen
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 28 Set/Sets per Month
Payment Terms: T/T,Western Union
Contact SupplierPackaging Detail: Standard smoked be packed in wooden cases
Delivery Detail: 2--10days
For industry
On the electrical, electronics, household appliances, automobiles, motorcycles, chemicals and other products, parts and materials for high temperature, low temperature and the temperature, humidity, and Damp heat test.
TEMI880/850 touch temperature and humidity control
TEMI880
High resolution ,color touch screen interface
Interactive parameter input
Support for Korean, English, Chinese
Provides built-in SMPS the I / O RELAY BOARD-wiring cost savings are simplified
Way to support both the wet-bulb and electronic humidity sensor
The convenience of PC-based monitoring
Easy to set as many as 37 kinds of output (built-in timer) mode
Support the use of UDC100 (option) USB memory - can replace the recorder
Built on an advanced auto-tuning PID algorithm
Communication environment and provide a strong platform to support multi-branch structure 99
Fuzzy functions and ARW excellent start - inhibition of overtravel
Display PV curve (0-8 days)
Model | Type of temperature and humidity MY-T-H-P-80R | ||||||||||||
volume(L) | 80 | 120 | 150 | 225 | 408 | 800 | 960 | 1000 | |||||
Thermostat mode | BTHC ayw(Way of balancing humidity thermostat ) | ||||||||||||
Operating temperature | +5---35°C | ||||||||||||
Heaters | Nickel-chromium alloy heating wire heater | ||||||||||||
Humidifier (temperature and humidity models) | shallow trough heated humidifier | ||||||||||||
Drum machine | centrifugal fan | ||||||||||||
Temperature (humidity) sensors | PT100 wet and dry bulb sensor | ||||||||||||
Performance | Temperature / humidity range | Temperature D -20°C 150°C, Z -40°C 150°C,G -70°C(150°C)Humidity 20%~98%RH | |||||||||||
Degree of temperature fluctuation | Temperature less than±0.5°C | Low less than±0.5°C | |||||||||||
Humidity stability | ±1%RH | ||||||||||||
Temperature uniformity | less than2°C | ||||||||||||
Deviation of temperature and humidity | running temperature and humidity less than±2°C/+/-3%RH Temperature Operating temperature less than+/-2°C,low temperature is less than + / -3 °C Heating time of+/-3°C | ||||||||||||
Heating time of | -20--+150°Cless than45 minutes -40--+150°Cless than 60 minutes -70--+150°Cless than 80 minutes | ||||||||||||
Cooling Time | +20——-20°Cless than 30 minutes 40——-40°Cless than 50 minutes +20——-70°Cless than 80 minutes | ||||||||||||
Structure and components | within the box inside and outside the box Material | box inside stainless steel outside the box steel or steel plate spray | |||||||||||
Insulation Material | Rigid polyurethane foam insulation material + glass wool | ||||||||||||
Controller | P meter installed,OYO Japan or Korea TEMI controller HMI Touch | ||||||||||||
Screen Controller | -40 °C low temperature refrigeration system when more than a single-stage compression refrigeration,when temperature is below -40 °Coptional two-stage compression refrigeration compressor France Taikang fully enclosed | ||||||||||||
Compressor overheat protection | overcurrent, over-pressure, heated humidification air burning, water alarm system | ||||||||||||
Power | 2Φ5KW 220VAC ± 10% or 2Φ3KW 220VAC +10 % optional |